Peracon commenced working with CPB Contractors in 2016 on the Rail Systems Alliance work package of the Melbourne Metro Tunnel Project. Over the five years to 2021 Peracon has had between 3 and 6 employees working for the Rail Systems Alliance on a secondment basis. The Rail Systems Work Package

Peracon worked for Powercor on their REFCL program of works for over 3 years. Peracon had 7 employees working in the Powercor team on a secondment basis. Peracon’s roles included the following: Primary design manager, Primary engineer, Civil engineer, Primary designers, and Secondary

Peracon have successfully completed the design of a 132 km double circuit 230 kV transmission tower line for Minera Panama (a subsidiary of First Quantum Minerals Limited) in Panama, South America. The line will supply the Cobre Panama copper mine 120 km west of Panama City. Peracon’s involvement

Peracon successfully completed the detailed design of the electrical, SCADA and protection systems for the first utility-scale, grid-connected 30MW /30MWh Ballarat Energy Storage System (BESS) in Victoria. We integrated the BESS into the AusNet Ballarat Terminal Station (BATS), by also completing

Citipower engaged Peracon for the design of their new indoor distribution substations, where Peracon used  Revit to prepare the final design documents.  CitiPower requested the use of Revit as most of the coordination with the other disciplines (Structural, Architectural, Civil) were

Lectel